SCU provided a 40ft energy storage container to a rural village in the Niger desert in Africa, helping it solve its long-term electricity problem and bringing substantial improvements to the lives of residents.
[PDF Version]
Our three-phase 100KW inverter used with LiFePo4 battery in the off-grid solar power system: provides a sustainable and cost-effective solution for powering large-scale applications off-grid.
[PDF Version]
Standard lead time is 15–20 days after deposit confirmation for 1–5 containers. Larger projects (6+ units) are scheduled based on production line availability with expedited options available upon request. Installation is already finished, and final testing is underway from 30 April.
[PDF Version]
Battery sizing is goal-driven: Emergency backup requires 10-20 kWh, bill optimization needs 20-40 kWh, while energy independence demands 50+ kWh. Your primary use case should drive capacity decisions, not maximum theoretical needs.